Mosaic’s October Construction Update

Brendan Dale
Brendan Dale
23/10/18

It’s hard to believe that we’re already in October – the year is flying by!

SOLIS – KINGS BEACH

Work on this landmark project is continuing to progress well.

Scaffolding is continuing to come down as glazing is completed to level 8, and the building’s stunning facade is beginning to emerge.

As Level 8 has been sheeted and the joinery installation gets underway, we’re all very proud to be finishing 2018 on a high note at Solis!

Solis balcony October

Things are ceetainly coming together at Solis!

 

SILVERGUM – EVERTON PARK

As work draws to a close at Silvergum, finishing trades are working their way through the town houses.

Final touches are also being made to external areas of the site. The Covercrete driveways together with the beautiful landscaping, to be completed this month, will really set off these stylish town houses.

silvergum october

Finishing touches are coming together at Silvergum!

HIGHBURY – UPPER KEDRON

Civil works have been completed on this house and land project, with titles lodged on 9 October 2018.

Now that titles have been received, we will call for 21 Day Settlements, after which construction will proceed.

Silvergum Driveway October

We’re excited for construction to commence at Highbury.

DRIFT – COOLUM

With bulk earthworks completed, the first ground slabs were poured – a significant milestone out at Drift!

In-ground drainage was completed for the eastern slabs, while work commenced on formwork for the suspended slab. Blockwork has commenced and is on-going.

Drift level October

Levelling up at Drift!

LURE – NEWPORT

We are pleased to report that Practical Completion has been reached on these outstanding terrace houses.

Handovers have begun, with all properties to be handed over to their new owners and tenants by the end of October.

Lure complete October

It’s time for Lure’s residents to move into their new homes!

ELM – ORMEAU

With civil and landscape rehabilitation works due to be completed by the end of the month, we expect to receive sealed plans from council towards the end of November.

This will allow titles to be registered in December.

Elm Ormeau October

There’s a lot of work to do before construction can begin, but we’re making steady progress.

VIVE – INDOOROOPILLY

Work is now well underway at Vive, with bulk earthworks and the rear blockwork retaining walls already completed.

The construction of the basement perimeter blockwork walls has commenced, as well as in-ground drainage and ground slab footings.

Vive blockwork october

Significant rain has hit Brisbane this month, but we’re not letting it slow us down too much!

Take a look at our Construction Update Videos to stay up to date on how our projects are progressing, and to see what Mosaic Construction have planned next.